210 MW.

Written by

in

210 MW. Portugal’s Next Wind Powerhouse — and We’re Sitting on the Grid Slot Everyone Else Wants.

While the market talks about Tâmega and Alto Minho, we’re bringing 210 MW of secured onshore wind capacity to the table — backed by a 300 MVA VPA grid connection that most developers can only dream of.

Let’s be blunt: grid capacity in Portugal is the real bottleneck, not turbines, not permits, not capital. Everyone’s chasing connection points. We already have ours — and it’s oversized.

This isn’t a mid-tier asset. This is Portugal’s likely single wind farm by capacity, trailing only two national mega-projects. And unlike those legacy complexes, our connection point still has ~90 MVA of untapped headroom sitting there, ready for solar or BESS hybridization the moment we decide to pull the trigger.

Investors chasing scale without secured grid access are gambling. We’re not gambling. We’re holding the asset AND the infrastructure to scale it further.

If you’re serious about Iberian renewables — this is the conversation to have.

DM us. Let’s talk numbers.

Read the full brief on LinkedIn →